Home   Products   Download Library   FAQ   News & Articles   Technical Support   Contact Us   About Us 


Frequently Asked Questions

Septic Tanks & Treatment Plants


Planning & Permits  
  What permissions are required before installing a tank/plant?

In the UK, any unit going into the ground may require ‘consent to discharge’ from the local Environment Agency / SEPA office, even if you are using just a storage tank. Planning permission is required from the local Building Control department (see Links).

This procedure and standards of what is permissible can vary between regions, so we advise you contact our Sales Department to discuss your options.

 

Planning & Permits  
  Do I need to get Planning Permission?

All new Wastewater treatment systems require planning permission. Adding a secondary treatment system (such as a Reed Bed) may also require planning permission. Titan’s advice would be to check with your local planning authority.

 

Frequently Asked Questions


Septic Tanks & Treatment Plants

Design
Planning & Permits
Installation
Performance

   
 

© 2007 Titan Pollution Control

Pollution control products for the next generation - titan, water, tank, treatment, sewage, cesspool, plant, septic, pollution, control, range, package, pump, freedom, biotec, rainwater, titan pollution, pollution control, treatment plant, biotec treatment, package pump, titan pollution control, titan biotec treatment Pollution control products for the next generation - titan, water, tank, treatment, sewage, cesspool, plant, septic, pollution, control, range, package, pump, freedom, biotec, rainwater, titan pollution, pollution control, treatment plant, biotec treatment, package pump, titan pollution control, titan biotec treatment